Recent projects

A selection of boreholes we have drilled, from 100 m to 300 m deep.

  • 230+Projects completed
  • 300 mDeepest borehole
  • 7Counties
Water bursting out of the new borehole at Keyo Village Deep Core Wells rig drilling at Keyo Village BeforeAfter

Keyo Village

Muhoroni, Kisumu County

Before and after. Drag to compare.

100 m deep
Drilling rig mast at Duka Moja, Narok County
Drilling crew at work at Duka Moja
Crew clearing drilling mud at Duka Moja

Duka Moja

Narok County

300 m deep
Drilling rig at Mutwot Comprehensive School, Simat
Water and cuttings blasting up through the rig during air-lift at Mutwot Comprehensive School

Mutwot Comprehensive School

Simat, Eldoret

140 m deep
Crew working the drill string at Bishop Muge Memorial, Nandi County
Red soil cuttings rising from the borehole at Bishop Muge Memorial

Bishop Muge Memorial

Nandi County

150 m deep
Crew watching cuttings rise at Tapsagoi Secondary School
Drilling rig at Tapsagoi Secondary School

Tapsagoi Secondary School

Turbo, Uasin Gishu County

150 m deep
Drilling rig on the grounds of Kaptebee High School, Turbo
Water and cuttings spraying from the drill string at Kaptebee High School

Kaptebee High School

Turbo, Uasin Gishu County

140 m deep
Deep Core Wells rig drilling in Kakuma, Turkana County

Kakuma

Turkana County

150 m deep
New borehole at Ndalat Job's School for the Physically Challenged, Mosop

Ndalat Job's School for the Physically Challenged

Mosop

150 m deep
Drilling rig and compressor truck on the field at Urudi, Kisumu County
Deep Core Wells rig drilling under a tree at Urudi, Kisumu County

Urudi

Kisumu County

180 m deep
Deep Core Wells crew working the drill string at Sigowet

Sigowet

Eldoret

160 m deep
Crew in hard hats at the drilling rig at TarTar, Simat
Drilling rig and pipe truck with blue casing at TarTar, Simat

TarTar

Simat, Eldoret

150 m deep
Drilling rig mast over the new borehole at Kaptinga Milk Plant
Drill string and wet cuttings at the borehole, Kaptinga Milk Plant

Kaptinga Milk Plant

Kaptinga, Eldoret

140 m deep
Drilling rig mast with water and cuttings at the borehole, Kaigat
Rig, crew and casing pipes on the school grounds at Kaigat
Casing set in the finished borehole with gravel pack, Kaigat

Kaigat

Eldoret

150 m deep
Drilling rig and compressor truck with crew at Murgor School, Turbo
Rig drilling with spray rising from the borehole at Murgor School

Murgor School

Turbo, Uasin Gishu County

160 m deep
Operator at the controls of the drilling rig at Elgon Estate, Turbo

Elgon Estate

Turbo, Uasin Gishu County

135 m deep
Drilling rig, compressor truck and crew beside Chepkongi Dispensary, Eldoret

Chepkongi Dispensary

Eldoret

155 m deep
Drilling rig among tall trees beside Chepkongi Primary School, Eldoret

Chepkongi Primary School

Eldoret

150 m deep
Crew on the drilling rig mast at Longonot DEB, Naivasha

Longonot DEB

Naivasha, Nakuru County

100 m deep
Deep Core Wells crew drilling with Life Water Canada in Mwingi

Drilling with Life Water Canada

Mwingi, Kitui County

Ready for your own water?

Free consultation, anywhere in Kenya.